United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Fitzgibbons Solar

Fitzgibbons Solar is a 400 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2094
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Pisgah Substation 230 kV
Location
San Bernardino County, California
Technology
Solar: 200 MW · Battery: 200 MW
Total requested
400 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
October 2025
Withdrawn
August 2021

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem