WIND Β· OPERATIONAL

Mynydd Brombil

Mynydd Brombil is a 8 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningAug 2012 (completed)
  2. ConsentedJul 2015 (completed)
  3. ConstructionFeb 2016 (completed)
  4. OperatingJan 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA13 2YN
Coordinates
51.5830, -3.7457

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Mynydd Brombil compares

365th of 488largest wind farms in the UK register
30th of 43in Wales
0.03%of listed UK wind farms capacity
β‰ˆ 18 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Mynydd Brombil Wind Farm
Developer / operator
REG Windpower
Planning authority
Neath Port Talbot
Planning reference
P2012/0638
Application submitted
29 August 2012
Permission granted
8 July 2015
Construction started
1 February 2016
Began operating
15 January 2017
Capacity in planning record
8 MW
Address
Brombil, Port Talbot, Neath Port Talbot
REPD reference
4193

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.