SOLAR Β· OPERATIONAL

Caergarw

Caergarw is a 4.93 MW solar farm in Wales, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningNov 2015 (completed)
  2. ConsentedMay 2016 (completed)
  3. ConstructionDec 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.93 MW
Status
Operational
Technology
Solar Β· PV
Operator
WPO UK Services
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
51.5401, -3.6997

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Caergarw compares

431st of 662largest solar farms in the UK register
45th of 75in Wales
0.09%of listed UK solar farms capacity
β‰ˆ 4.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.93 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,600 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Caergarw Farm
Developer / operator
Suncredit UK (Sunventures 7)
Planning authority
Neath Port Talbot
Planning reference
P2015/0692
Application submitted
23 November 2015
Permission granted
17 May 2016
Construction started
20 December 2016
Began operating
20 March 2017
Capacity in planning record
3.8 MW
Address
Land at Caegarw Farm, Margam, Pyle, Bridgend, Mid Glamorgan, CF33 6PT
REPD reference
6035

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026