SOLAR Β· OPERATIONAL

Stormy Down

Stormy Down is a 4.67 MW solar farm in Wales, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningMay 2015 (completed)
  2. ConsentedAug 2015 (completed)
  3. ConstructionJan 2017 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.67 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CF33 4RS
Coordinates
51.5120, -3.6708

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Stormy Down compares

476th of 662largest solar farms in the UK register
52nd of 75in Wales
0.08%of listed UK solar farms capacity
β‰ˆ 4.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.67 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Stormy Down Solar Farm
Developer / operator
Belisama Energy
Planning authority
Bridgend
Planning reference
P/15/312/FUL
Application submitted
13 May 2015
Permission granted
27 August 2015
Construction started
27 January 2017
Began operating
27 March 2017
Capacity in planning record
3.8 MW
Address
Stormy Down Transfer Station, Stormy Down, Bridgend, Mid Glamorgan, CF33 4RS
REPD reference
6520

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.