SOLAR Β· OPERATIONAL

Carn Nicholas

Carn Nicholas is a 9.9 MW solar farm in Wales, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningJan 2020 (completed)
  2. ConsentedMar 2021 (completed)
  3. Construction (completed)
  4. OperatingJan 2023 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
9.9 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA1 7BL
Coordinates
51.6319, -3.9109

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carn Nicholas compares

150th of 662largest solar farms in the UK register
14th of 75in Wales
0.18%of listed UK solar farms capacity
β‰ˆ 8.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 9.9 MW station would generate roughly 8.7 GWh of electricity in a year, similar to the annual use of about 3,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Carn Nicholas Farm (Extension)
Developer / operator
Innova Renewables Limited
Planning authority
Swansea
Planning reference
2020/0173/FUL
Application submitted
31 January 2020
Permission granted
17 March 2021
Began operating
1 January 2023
Capacity in planning record
10 MW
Address
Land At Carn Nicholas Farm, Bonymaen, Swansea, West Glamorgan, SA1 7BL
REPD reference
6834

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.