SPD 4 - Gelliwern
SPD 4 - Gelliwern is a 6.24 MW solar farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 6.24 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- RES Group
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 51.7000, -3.9928
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How SPD 4 - Gelliwern compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.24 MW station would generate roughly 5.5 GWh of electricity in a year, similar to the annual use of about 2,020 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by RES GroupNearby generating sites
- Abergelli Β· 7.68 MW solar farm3.1 km
- Rhydypandy Β· 6.38 MW solar farm3.8 km
- Mynydd y Gwair Β· 32.8 MW onshore wind farm7.0 km
- Cockett Valley Β· 5 MW solar farm7.0 km
- Carn Nicholas Β· 9.9 MW solar farm9.4 km
- Pen-Y-Cae Β· 6.76 MW solar farm10.0 km
- Saron Β· 6.33 MW solar farm10.7 km
- Brynteg Β· 14.8 MW solar farm12.8 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Gelliwern Isaf Farm
- Developer / operator
- Solar Park Developments
- Planning authority
- Swansea
- Planning reference
- 2014/0739
- Application submitted
- 21 May 2014
- Permission granted
- 12 November 2014
- Construction started
- 1 January 2015
- Began operating
- 31 March 2015
- Capacity in planning record
- 6 MW
- Address
- Land to South of Gelliwern Isaf Felindre Swansea, West Glamorgan, SA5 7PJ
- REPD reference
- 2334
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source