WIND Β· OPERATIONAL

Mynydd y Gwair

Mynydd y Gwair is a 32.8 MW onshore wind farm in Wales, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningSep 2012 (completed)
  2. ConsentedFeb 2013 (completed)
  3. ConstructionFeb 2017 (completed)
  4. OperatingApr 2019 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
32.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RWE Npower
Region
Wales
Country
Wales
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
51.7573, -3.9516

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Mynydd y Gwair compares

149th of 488largest wind farms in the UK register
9th of 43in Wales
0.11%of listed UK wind farms capacity
β‰ˆ 75 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 32.8 MW station would generate roughly 75 GWh of electricity in a year, similar to the annual use of about 27,670 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Mynydd Y Gwair Wind Farm
Developer / operator
RWE Npower Renewables/ Innogy
Planning authority
Swansea
Planning reference
2012/1221
Application submitted
11 September 2012
Permission granted
8 February 2013
Construction started
8 February 2017
Began operating
24 April 2019
Capacity in planning record
32.8 MW
Address
Swansea,, West Glamorgan
REPD reference
4648

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.