πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Llynfi Afan Renewable Energy Limited

Llynfi Afan Renewable Energy Limited is a 24 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningNov 2010 (completed)
  2. ConsentedJul 2013 (completed)
  3. ConstructionMay 2016 (completed)
  4. OperatingSep 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
24 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA13 3YE
Coordinates
51.6536, -3.6023

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Llynfi Afan Renewable Energy Limited compares

202nd of 488largest wind farms in the UK register
14th of 43in Wales
0.08%of listed UK wind farms capacity
β‰ˆ 55 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 24 MW station would generate roughly 55 GWh of electricity in a year, similar to the annual use of about 20,250 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Llynfi Afan Renewable Energy Park
Developer / operator
John Laing Environmental Assets Group
Planning authority
Neath Port Talbot
Planning reference
P/10/844/FULΒ 
Application submitted
15 November 2010
Permission granted
18 July 2013
Construction started
27 May 2016
Began operating
14 September 2017
Capacity in planning record
6 MW
Address
Mynydd Y Gelli, Port Talbot, Bridgend, Neath Port Talbot
REPD reference
4644

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.