Pant y Wal
Pant y Wal is a 52.5 MW onshore wind farm in Wales, operated by Pennant Walters. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 52.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Pennant Walters
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- CF35 6ED
- Coordinates
- 51.6129, -3.5050
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Pant y Wal compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 52.5 MW station would generate roughly 120 GWh of electricity in a year, similar to the annual use of about 44,290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by Pennant WaltersNearby generating sites
- Pant y Wal Extension Β· 20 MW onshore wind farm3.1 km
- Taff Ely Β· 9 MW onshore wind farm5.6 km
- Ferndale Wind Farm Β· 6.4 MW onshore wind farm5.6 km
- Mynydd Portref Β· 12 MW onshore wind farm7.0 km
- Llynfi Afan Renewable Energy Limited Β· 24 MW onshore wind farm8.1 km
- Maerdy Β· 24 MW onshore wind farm8.3 km
- Pen Y Cymoedd Β· 228 MW onshore wind farm8.4 km
- Pen Rhiw Β· 4.75 MW solar farm10.8 km
Also operated by Pennant Walters
Pennant Walters operates 6 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Pennant Wind Energy Ventures (PWEV)
- Planning authority
- Bridgend
- Planning reference
- P/06/417/FUL
- Application submitted
- 31 March 2006
- Permission granted
- 4 May 2011
- Construction started
- 1 April 2012
- Began operating
- 1 June 2013
- Capacity in planning record
- 25 MW
- Address
- Mynydd Maesteg, Mynydd Pwlle yr Helog, Ogmore Vale, Rhondda Valley, Mid Glamorgan
- REPD reference
- 4039
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.