Mynydd Bwllfa
Mynydd Bwllfa is a 22.5 MW onshore wind farm in Wales, operated by Pennant Walters. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 22.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Pennant Walters
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- CF44 9NB
- Coordinates
- 51.7356, -3.5078
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Mynydd Bwllfa compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 22.5 MW station would generate roughly 51 GWh of electricity in a year, similar to the annual use of about 18,980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by Pennant WaltersNearby generating sites
- Hendre Fawr Β· 11.6 MW solar farm4.7 km
- Maerdy Β· 24 MW onshore wind farm5.3 km
- Pen Y Cymoedd Β· 228 MW onshore wind farm6.6 km
- Maesgwyn Solar Β· 2.5 MW solar farm7.5 km
- Maesgwyn Extension Β· 2.5 MW onshore wind farm9.4 km
- Ferndale Wind Farm Β· 6.4 MW onshore wind farm10.2 km
- Ffynnon Oer Β· 32 MW onshore wind farm10.5 km
- Maesgwyn Β· 26 MW onshore wind farm10.5 km
Also operated by Pennant Walters
Pennant Walters operates 6 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Mynydd Bwllfa Wind Farm - Resubmission
- Developer / operator
- Pennant Walters
- Planning authority
- Rhondda Cynon Taf
- Planning reference
- 09/0393/10
- Application submitted
- 5 May 2009
- Permission granted
- 1 June 2012
- Construction started
- 1 February 2014
- Began operating
- 8 May 2015
- Capacity in planning record
- 22.5 MW
- Address
- South of Hirwaun, Mid Glamorgan
- REPD reference
- 3705
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026