πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Maesgwyn Solar

Maesgwyn Solar is a 2.5 MW solar farm in Wales, operated by Pennant Walters. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningAug 2014 (completed)
  2. ConsentedMay 2015 (completed)
  3. ConstructionDec 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
2.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Pennant Walters
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SA11 5TU
Coordinates
51.7512, -3.6141

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Maesgwyn Solar compares

597th of 662largest solar farms in the UK register
69th of 75in Wales
0.04%of listed UK solar farms capacity
β‰ˆ 2.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 2.5 MW station would generate roughly 2.2 GWh of electricity in a year, similar to the annual use of about 810 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Pennant Walters

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Maesgwyn solar farm
Developer / operator
Walters Group
Planning authority
Neath Port Talbot
Planning reference
P2014/0762
Application submitted
5 August 2014
Permission granted
28 May 2015
Construction started
1 December 2016
Began operating
15 February 2017
Capacity in planning record
7.5 MW
Address
Land East of Maesgwyn Wind Farm Glynneath Neath, West Glamorgan
REPD reference
2215

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.