Hendre Fawr
Hendre Fawr is a 11.6 MW solar farm in Wales, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 11.6 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CF44 9RJ
- Coordinates
- 51.7427, -3.5751
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Hendre Fawr compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.6 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,770 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by Greencoat CapitalNearby generating sites
- Maesgwyn Solar Β· 2.5 MW solar farm2.8 km
- Mynydd Bwllfa Β· 22.5 MW onshore wind farm4.7 km
- Maesgwyn Extension Β· 2.5 MW onshore wind farm4.8 km
- Ffynnon Oer Β· 32 MW onshore wind farm5.9 km
- Maesgwyn Β· 26 MW onshore wind farm5.9 km
- Pen Y Cymoedd Β· 228 MW onshore wind farm6.9 km
- Maerdy Β· 24 MW onshore wind farm7.4 km
- Llynfi Afan Renewable Energy Limited Β· 24 MW onshore wind farm10.1 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Hendre Fawr Farm
- Developer / operator
- INRG Solar
- Planning authority
- Neath Port Talbot
- Planning reference
- P2013/0635
- Application submitted
- 18 September 2013
- Permission granted
- 6 July 2014
- Construction started
- 15 November 2014
- Began operating
- 6 March 2015
- Capacity in planning record
- 11.6 MW
- Address
- Land at Hendrefawr Farm, Mount Road, Rhigos, Neath, West Glamorgan, West Glamorgan, CF44 9RJ
- REPD reference
- 2286
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.