WIND Β· OPERATIONAL

Mynydd Portref

Mynydd Portref is a 12 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningJun 2012 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionApr 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CF35 6NR
Coordinates
51.5564, -3.4597

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Mynydd Portref compares

305th of 488largest wind farms in the UK register
23rd of 43in Wales
0.04%of listed UK wind farms capacity
β‰ˆ 27 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 10,120 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Mynydd Portref Wind Farm extension
Developer / operator
REG Windpower
Planning authority
Rhondda Cynon Taf
Planning reference
12/0704/10
Application submitted
29 June 2012
Permission granted
19 December 2014
Construction started
11 April 2016
Began operating
1 March 2017
Capacity in planning record
12 MW
Address
Mid Glamorgan
REPD reference
4194

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.