🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown609178.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

609 projects · page 8 of 13
ProjectCapacityStageConnection siteFrom
Milligansbush Battery Storage
Battery storage · Milligansbush Battery Storage Ltd
200 MWScoping Milligansbush Battery Storage 132kV Substation
SP Transmission (south Scotland)
Mar 2031
Monk Fryston BESS
Battery storage · Harmony Mf Limited
200 MWScoping Monk Fryston 275kV Substation
National Grid (England & Wales)
Oct 2029
Mount Pleasant
Battery storage · Harmony Energy Limited
200 MWScoping Warwickshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Murroch BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Strathleven GSP
SP Transmission (south Scotland)
May 2031
Myreton BESS
Battery storage · GPC 1039 Ltd
200 MWScoping Tealing 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
NEL Limes
Battery storage · SFEL Two Limited
200 MWScoping North Humber Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2035
NEL Tiger
Battery storage · UE 1 LTD
200 MWScoping Ferrybridge B 132kV Substation
National Grid (England & Wales)
Oct 2035
Netherton Hub Bess
Battery storage · Field Netherton Ltd
200 MWScoping Longside 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
New Deer 2 BESS
Battery storage · Field New Deer Ltd
200 MWScoping New Deer 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
North Lanrigg Battery Storage
Battery storage · North Lanrigg Battery Storage Ltd
200 MWScoping North Lanrigg Substation
SP Transmission (south Scotland)
Oct 2028
Offerton 200MW BESS
Battery storage · Decerna Limited
200 MWScoping Wearside Connection Node B2 400kV substation
National Grid (England & Wales)
Oct 2035
Patmores (Mott Street)
Battery storage · Innova Renewables Limited
200 MWScoping London North East Connection Node A 132kv Substation
National Grid (England & Wales)
Oct 2038
Pitkevy BESS
Battery storage · Harmony Energy Limited
200 MWScoping Conland Substation
SP Transmission (south Scotland)
Oct 2034
Pond Flexible Energy Park
Battery storage · Pond Flexible Energy Park Limited
200 MWScoping Pond Flexible Energy Park 132kV Substation
SP Transmission (south Scotland)
Jun 2031
Rhigos BESS
Battery storage · REWE 11 Limited
200 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Rigifa BESS
Battery storage · Field Rigifa Limited
200 MWScoping Gills Bay 132kV
SSEN Transmission (north Scotland)
Dec 2029
Rutherend Farm
Battery storage · Ecocel Energy (Storage) Ltd
200 MWScoping East Kilbride 275kV Substation
SP Transmission (south Scotland)
Oct 2033
Saltend North BESS & PV
Battery storage · Eeb74 Limited
200 MWScoping Hedon 275kV Substation
National Grid (England & Wales)
Oct 2035
Salters Battery Storage
Battery storage · Buccleuch Estates, Ltd. (The)
200 MWAwaiting Consents Dalkeith 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Saltholme BESS
Battery storage · Harmony SH Limited
200 MWScoping Saltholme 275kV Substation
National Grid (England & Wales)
Oct 2035
Scotton
Battery storage · Harmony Energy Limited
200 MWScoping Leeds North Connection Node G
National Grid (England & Wales)
Oct 2039
Shurton BESS
Battery storage · Field Shurton Ltd
200 MWScoping West Country Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
StrataStore - Cheshire Energy Storage Facility
Battery storage · Kistos Energy Storage Ltd
200 MWScoping Gorstage 400kV Substation
National Grid (England & Wales)
Nov 2037
Sunbury BESS
Battery storage · Sunbury BESS Ltd
200 MWScoping Laleham GSP (SEPD)
National Grid (England & Wales)
Feb 2031
Tewitt Farm BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Leeds North Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
TH Didcot
Battery storage · FRV Powertek Limited
200 MWScoping Chiltern Connection Node D 400kV
National Grid (England & Wales)
Oct 2037
TH Knaresborough
Battery storage · FRV Powertek Limited
200 MWScoping Leeds North Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2036
TH Maes Melin
Battery storage · FRV Powertek Limited
200 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
TH Ninfield
Battery storage · FRV Powertek Limited
200 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
TH West Weybridge
Battery storage · FRV Powertek Limited
200 MWScoping London West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Thornton BESS
Battery storage · Rewe 9 Limited
200 MWScoping North Humber Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Thurcroft Storage
Battery storage · Bsr Applications Limited
200 MWScoping Leeds South Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2039
Tyler Hill Ansty
Battery storage · FRV Tyler Hill BESS 1 Ltd
200 MWScoping Warwickshire Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2037
Walsoken Battery
Battery storage · Walsoken Limited
200 MWScoping North Anglia Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2034
Warley Battery Energy Storage
Battery storage · London And Essex Energy Limited
200 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2029
West Saval Battery Storage
Battery storage · West Saval Battery Storage Ltd
200 MWScoping West Saval Substation 132 kV
SSEN Transmission (north Scotland)
Oct 2030
Whitecraig BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Dalkeith 400kV Substation
SP Transmission (south Scotland)
Jun 2031
WindyHill BESS2 Facility
Battery storage · Windyhill Grid 2 Ltd
200 MWScoping Windyhill 275/132kV
SP Transmission (south Scotland)
Jul 2025
Womblehill BESS Farm
Battery storage · RE Projects Development Limited
200 MWScoping Womblehill BESS Farm 132kV
SSEN Transmission (north Scotland)
Dec 2029
Woodcock Faulds Battery Storage
Battery storage · Woodcock Faulds Battery Storage Limited
200 MWScoping Gartclash Collector 275Kv Substation
SP Transmission (south Scotland)
Oct 2029
Yaxley BESS
Battery storage · Field Yaxley Ltd
200 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Zenobe New Deer Battery Storage
Battery storage · Zenobe Energy Limited
200 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Tyler Hill Iver
Battery storage · FRV Powertek Limited
200 MWAwaiting Consents London West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2038
Manor Farm_Sidcup
Battery storage · Firstway Solar Ltd
200 MWScoping North Kent Connection Node C 132Kv Substation
National Grid (England & Wales)
Oct 2037
Mill Hey_Capenhurst BESS
Battery storage · Firstway Solar Ltd
200 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
NEL Nicholson
Battery storage · UE 2 LTD
180 MWScoping Thorpe Marsh GSP
National Grid (England & Wales)
Oct 2035
Upper Greenfields BESS
Battery storage · S4 UK DEV LTD
175 MWScoping New Deer 2 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Elstree Energy Storage
Battery storage · Elstree Battery Storage Limited
170 MWScoping Letchmore Heath 132kV Substation
National Grid (England & Wales)
Jul 2030
Gresham House Connagill BESS
Battery storage · Energyhubdevelopments Limited
170 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Innerwick BESS
Battery storage · Innerwick Storage Ltd
170 MWScoping Braxbess 400/132kV Collector Substation
SP Transmission (south Scotland)
Jul 2028
Page 8 of 13

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.