Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SHET

New Deer 2 BESS

New Deer 2 BESS is a 200 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at New Deer 2 400kV Substation, with capacity due from October 2033. The connection agreement is held by Field New Deer Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004758
Customer
Field New Deer Ltd
Technology
Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
31 October 2033
Connection site
New Deer 2 400kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near New Deer Β· Grid map

Other projects at New Deer 2 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem