Scotton is a 200 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Leeds North Connection Node G, with capacity due from October 2039. The connection agreement is held by Harmony Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2039 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005920
- Customer
- Harmony Energy Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 30 October 2039
- Connection site
- Leeds North Connection Node G
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a βconnection nodeβ) that has not been built or located yet.