NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,329586.0 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,329 projects · page 7 of 27
ProjectCapacityStageConnection siteFrom
Dunstable
Solar + storage · Connectid 9 Limited
600 MWScoping West Anglia Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2034
Fancott
Battery storage · Kona Asset 2 Limited
600 MWScoping Sundon 400kV Substation
National Grid (England & Wales)
Oct 2031
Fiddlers Ferry BESS
Battery storage · Fiddlers Ferry Ltd
600 MWConsents Approved Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Oct 2028
Flinton Road
Solar + storage · Flinton Road Solar Limited
600 MWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2039
Harlaston
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Harlaston 400kV Substation
National Grid (England & Wales)
Oct 2033
Ironbridge
Solar + storage · Igp Solar 16 Limited
600 MWScoping Ironbridge 400kV Substation
National Grid (England & Wales)
Apr 2031
Letch Beck Energy Park
Solar + storage · Renewable Energy Systems Limited
600 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2033
Lightsourcebp Amlwch BESS and Hydrogen
Battery storage · Lightsource Renewable UK Development Limited
600 MWScoping Wylfa South 400kV Substation
National Grid (England & Wales)
Oct 2037
Lower Pool Energy Park
Solar + storage · Renewable Energy Systems Limited
600 MWScoping Derbyshire Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Newark BESS
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Coddington 400kV Substation
National Grid (England & Wales)
Sep 2033
Ninfield Green Energy Centre
Solar + storage · Ninfield Ng Limited
600 MWAwaiting Consents Ninfield 400kV Substation
National Grid (England & Wales)
Oct 2031
Oakley
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Oakley 400kV Substation
National Grid (England & Wales)
Nov 2038
Ossian 2 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2031
Ossian 3 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2033
Penwortham Green Energy Centre
Solar + storage · Penwortham NG Limited
600 MWAwaiting Consents Penwortham 400kV Substation
National Grid (England & Wales)
Oct 2035
Ranby
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Jubilee Farm 275kV Substation
National Grid (England & Wales)
Aug 2034
Rugeley
Solar + storage · Igp Solar 17 Limited
600 MWScoping Rugeley 400kV Substation
National Grid (England & Wales)
Aug 2031
Sandford
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping SANDFORD B 400kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Southery
Solar + storage · Sse Southery Solar Limited
600 MWScoping Southery 400kV Substation
National Grid (England & Wales)
Oct 2031
St Asaph SSE
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Nov 2037
Steeple Solar Farm
Solar + storage · Steeple Solar Farm Limited
600 MWScoping West Burton 400kV Substation
National Grid (England & Wales)
Oct 2029
West Haddon
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping West Haddon 400kV Substation
National Grid (England & Wales)
Oct 2039
Willington
Solar + storage · Sse Utility Solutions Limited
600 MWScoping Willington 400kV Substation
National Grid (England & Wales)
Oct 2029
Ratcliffe-on-Soar II
Solar + storage · Enso Green Holdings Limited
590 MWScoping Ratcliffe-On-Soar 400kV Substation
National Grid (England & Wales)
Oct 2033
Tween Bridge Solar Park
Solar + storage · RWE Renewables UK Solar and Storage Limited
590 MWScoping Trent Valley North Connection Node B 400kV Substation
National Grid (England & Wales)
Nov 2032
East West Interconnector
Interconnector · Eirgrid Interconnector Designated Activity Company
585 MWBuilt Deeside 400kV Substation
National Grid (England & Wales)
Navenby GEC (Ethos Green)
Solar + storage · Navenby Green Energy Centre Ltd
580 MWAwaiting Consents Navenby 400kV Substation
National Grid (England & Wales)
Oct 2033
Race Bank Wind Farm
Offshore wind · Race Bank Wind Farm Limited
565 MWBuilt Race Bank 132kV Substation
National Grid (England & Wales)
Market Harborough GEC (Ethos Green)
Solar + storage · Market Harborough Green Energy Centre Ltd
560 MWAwaiting Consents Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2032
Cleve Hill Solar Park
Solar + storage · Cleve Hill Solar Park Limited
550 MWBuilt Cleve Hill 400kV Substation
National Grid (England & Wales)
Jun 2036
Eggborough
Battery storage · Sse Eggborough Limited
550 MWScoping Eggborough 400kV Substation
National Grid (England & Wales)
Jun 2032
Elmya Towcester BESS
Battery storage · Rpc Elmya Carnation Towcester Limited
550 MWScoping Derbyshire Connection Node I 400kV Substation
National Grid (England & Wales)
Oct 2037
Graeme Road Solar & BESS
Solar + storage · Greentech Projects Holding UK Limited
550 MWScoping Ryhall 400kV Substation
National Grid (England & Wales)
Oct 2038
New Marton GEC
Solar + storage · New Marton Green Energy Centre Limited
550 MWScoping Cheshire Connection Node A2 400kV
National Grid (England & Wales)
Oct 2037
North Killingholme Power Project
Gas · Uniper UK Limited
540 MWConsents Approved Killingholme 400kV Substation
National Grid (England & Wales)
Sep 2030
Greenlink
Interconnector · Greenlink Interconnector Limited
524 MWBuilt Pembroke 400kV Substation
National Grid (England & Wales)
Astwood Solar Farm GEC
Solar + storage · Astwood Green Energy Ltd
520 MWScoping West Anglia Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2034
Cottered - PVDP
Solar + storage · SolarNine Ltd
520 MWScoping West Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2034
Yaxley
Solar + storage · Connectid 2 Limited
520 MWAwaiting Consents North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum -New Marton
Solar + storage · Noventum Power Solar 11 Limited
510 MWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Alcemi Bramford Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 1 Limited
500 MWScoping Bramford 400kV Substation
National Grid (England & Wales)
Oct 2030
Baglan BESS IPC
Battery storage · Ipc Grid Connection Two Limited
500 MWScoping South Wales West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2036
Bellbroughton Energy Park
Solar + storage · Elgin Energy Es Co Limited
500 MWScoping Warwickshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Blue Planet Solar
Solar + storage · Blue Planet Solar Limited
500 MWScoping Dungeness 400kV Substation
National Grid (England & Wales)
Aug 2031
Boreham
Solar + storage · Longfield Solar Energy Farm Limited
500 MWScoping Bulls Lodge 400kV Substation
National Grid (England & Wales)
Oct 2034
Braybrooke Solar and Battery Connection
Solar + storage · Irena BESS LIMITED
500 MWScoping Braybrooke (Network Rail) GSP
National Grid (England & Wales)
Oct 2031
Cambridgeshire Energy Storage Centre
Hydro and pumped storage · Hydrostor UK Ltd
500 MWScoping South Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Carbon Free 2030
Solar + storage · Carbon Free 2030 Energy Limited
500 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Jun 2034
Clean Planet Solar
Solar + storage · Clean Planet Solar Farm Limited
500 MWScoping Frodsham 400kV Substation
National Grid (England & Wales)
Nov 2037
Cornwall Energy Park
Solar + storage · Green Energy Mab Ltd
500 MWScoping Tideford 400kV Substation
National Grid (England & Wales)
Dec 2036
Page 7 of 27

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.