NESO TEC REGISTER · GREAT BRITAIN

Offshore wind projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown150131.9 GW in total
In planning95scoping or awaiting consent
Consented or building12closest to connecting
Built43connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

150 projects · page 2 of 3
ProjectCapacityStageConnection siteFrom
Bowdun (ex Cluaran Deas Ear) Offshore Wind Farm
Offshore wind · Bowdun Offshore Wind Farm Limited
1.0 GWAwaiting Consents Hurlie 400kV substation
SSEN Transmission (north Scotland)
Dec 2035
Cormoran Offshore Wind Farm
Offshore wind · South West Wind Holdco Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Mererid Offshore Wind Farm
Offshore wind · South West Wind Holdco Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Ossian 4 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
1.0 GWScoping Cousland 400kV
National Grid (England & Wales)
Oct 2033
Celtic 2 Offshore Wind Farm
Offshore wind · RWE Offshore Wind
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2031
Celtic Sea Offshore Wind Farm (ESB)
Offshore wind · Esb Asset Development UK Limited
1.0 GWScoping Celtic Sea 275/66Kv Offshore Substation
National Grid (England & Wales)
Oct 2031
Equinor Celtic Sea 1
Offshore wind · Equinor New Energy Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Equinor Celtic Sea 2
Offshore wind · Equinor New Energy Limited
1.0 GWScoping Equinor 66Kv Offshore Substation
National Grid (England & Wales)
Dec 2036
Gwynt Glas Offshore Wind Farm 2
Offshore wind · Gwynt Glas Offshore Wind Farm Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
Icewind Blyth
Offshore wind · Kari Energy Limited
1.0 GWScoping Blyth 400kV Substation
National Grid (England & Wales)
Oct 2031
Icewind Connah's Quay
Offshore wind · Kari Energy Limited
1.0 GWScoping Connah's Quay 400kV Substation
National Grid (England & Wales)
Nov 2033
Icewind Hawthorn Pit
Offshore wind · Kari Energy Limited
1.0 GWScoping Hawthorn Pit 400kV Substation
National Grid (England & Wales)
Oct 2031
Llywelyn Extension Offshore Wind Farm
Offshore wind · Renantis UK Limited
1.0 GWScoping Llywelyn Extension Offshore Wind Farm 66/275Kv Offshore Substation
National Grid (England & Wales)
Dec 2036
Marram Wind Offshore Wind Farm
Offshore wind · Marramwind Limited
1.0 GWScoping Longside 400kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Muir Mhor Offshore Wind Farm
Offshore wind · Muir Mhòr Offshore Wind Farm Limited
1.0 GWAwaiting Consents Longside 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
North Falls Offshore Wind Farm
Offshore wind · North Falls Offshore Wind Farm Limited
1.0 GWScoping North Falls Offshore Platform Substation
National Grid (England & Wales)
Oct 2030
Petroc Extension Offshore Wind Farm
Offshore wind · Bluefloat Energy UK Holdings Limited
1.0 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Dec 2036
SPR CS1
Offshore wind · Scottish Power Renewables (UK) Limited
1.0 GWScoping Spr Cs1 275/66Kv Offshore Substation
National Grid (England & Wales)
Oct 2037
Stromar Offshore Windfarm
Offshore wind · Stromar Offshore Wind Farm Limited
1.0 GWScoping Greens 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Buchan 01 Offshore Wind Farm
Offshore wind · Buchan Offshore Wind Limited
960 MWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Scira-Dudgeon Extension
Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited
950 MWScoping Norwich Main 400kV Substation
National Grid (England & Wales)
Oct 2031
Broadshore Offshore Wind Farm
Offshore wind · Broadshore Offshore Wind Farm Limited
900 MWScoping Longside 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Moray East Offshore Wind Farm
Offshore wind · Moray Offshore Windfarm (East) Limited
900 MWBuilt New Deer 400kV Substation
SSEN Transmission (north Scotland)
Spiorad Na Mara Offshore Wind Farm
Offshore wind · Spiorad Na Mara Limited
900 MWScoping Arnish Lewis Hub 400kV Substation
SSEN Transmission (north Scotland)
Dec 2030
East Anglia One North
Offshore wind · East Anglia One North Limited
880 MWAwaiting Consents Friston 400kV Substation
National Grid (England & Wales)
Oct 2034
East Anglia Two
Offshore wind · East Anglia Two Limited
880 MWAwaiting Consents EA2A and EA2B 275/66kV Offshore Platform
National Grid (England & Wales)
Dec 2030
East Anglia One North
Offshore wind · East Anglia One North Limited
860 MWAwaiting Consents Friston 400kV Substation
National Grid (England & Wales)
Oct 2029
East Anglia Two
Offshore wind · East Anglia Two Limited
860 MWAwaiting Consents EA2A and EA2B 275/66kV Offshore Platform
National Grid (England & Wales)
Mar 2028
Moray West Offshore Windfarm
Offshore wind · Moray Offshore Windfarm (West) Limited
860 MWBuilt Moray Firth 220/33kV Platform 1 & 2 Offshore Substation
SSEN Transmission (north Scotland)
Triton Knoll Offshore Wind Farm
Offshore wind · Triton Knoll Offshore Wind Farm Limited
824 MWBuilt Triton Knoll Offshore Substation
National Grid (England & Wales)
OWPL Windfarm
Offshore wind · Offshore Wind Power Limited
750 MWScoping Banniskirk 400kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Scira-Dudgeon Extension
Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited
719 MWScoping Norwich Main 400kV Substation
National Grid (England & Wales)
Jan 2030
East Anglia One
Offshore wind · East Anglia One Limited
680 MWBuilt Platform EA One 220/66kV Offshore Substation
National Grid (England & Wales)
London Array Offshore Wind Farm
Offshore wind · London Array Limited
630 MWBuilt London Array 33/150kV Offshore Substations
Offshore transmission owner
Caledonia Offshore Wind Farm
Offshore wind · Caledonia Offshore Wind Farm Limited
600 MWScoping Greens 400kV Substation
SSEN Transmission (north Scotland)
Mar 2031
Cerulean Winds INTOG 1
Offshore wind · Cerulean Winds Limited
600 MWAwaiting Consents Hurlie 400kV substation
SSEN Transmission (north Scotland)
Oct 2033
Ossian 2 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2031
Ossian 3 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
600 MWScoping Western Marsh 400kV
National Grid (England & Wales)
Oct 2033
Beatrice Wind Farm
Offshore wind · Beatrice Offshore Windfarm Limited
588 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
Gwynt Y Mor Offshore Wind Farm
Offshore wind · Gwynt Y Mor Offshore Wind Farm Limited
574 MWBuilt Gwynt y Mor 132/33kV Offshore Substation
Offshore transmission owner
Race Bank Wind Farm
Offshore wind · Race Bank Wind Farm Limited
565 MWBuilt Race Bank 132kV Substation
National Grid (England & Wales)
Green Volt Offshore Windfarm
Offshore wind · Green Volt Offshore Windfarm Ltd
560 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Inch Cape Offshore Wind Farm Platform 1
Offshore wind · Inch Cape Offshore Limited
540 MWUnder Construction/Commissioning Cockenzie 400/275kV
SP Transmission (south Scotland)
Feb 2026
Inch Cape Offshore Wind Farm Platform 2
Offshore wind · Inch Cape Offshore Limited
540 MWUnder Construction/Commissioning Cockenzie 275kV substation
SP Transmission (south Scotland)
Feb 2026
Arven South Offshore Wind Farm
Offshore wind · Arven South Limited
500 MWScoping Northern Shetland 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Greater Gabbard Offshore Wind Farm
Offshore wind · Greater Gabbard Offshore Winds Limited
500 MWBuilt Gabbard 33/132kV Offshore Substation
Offshore transmission owner
Seagreen Phase 1A
Offshore wind · Seagreen 1A Limited
500 MWUnder Construction/Commissioning Cockenzie 400/275kV
SP Transmission (south Scotland)
Apr 2028
Sealtainn Offshore Wind Farm
Offshore wind · Shetland Offshore Wind Limited
500 MWScoping Northern Shetland 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Magwind
Offshore wind · Magnora Offshore Wind N3 Limited
495 MWScoping Arnish Lewis Hub 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Morecambe Offshore Wind Farm
Offshore wind · Morecambe Offshore Windfarm Ltd
480 MWScoping Penwortham 400kV Substation
National Grid (England & Wales)
Jun 2029

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.