NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 2 of 32
ProjectCapacityStageConnection siteFrom
Celtic MPI
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Oct 2037
Gridlink Interconnector
Interconnector · Gridlink Interconnector Limited
1.5 GWScoping Kingsnorth 400kV Substation
National Grid (England & Wales)
Mar 2029
Nautilus
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Wallend 400kV Substation
National Grid (England & Wales)
Oct 2029
Western MPI
Interconnector · National Grid Interconnector Holdings Limited
1.5 GWScoping Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2037
Fearna PSH 2
Hydro and pumped storage · Fearna Psh Limited
1.5 GWAwaiting Consents Fearna Pump Storage Hydro 2 400/15kV Substation
SSEN Transmission (north Scotland)
Nov 2036
Dogger Bank D Offshore Wind Farm
Offshore wind · Doggerbank Offshore Wind Farm Project 4 Projco Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2031
Dogger Bank South East
Offshore wind · RWE Renewables UK Dogger Bank South (East) Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Nov 2031
Dogger Bank South West
Offshore wind · Rwe Renewables UK Dogger Bank South (West) Limited
1.5 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Nov 2031
Ferrybridge D
Hydro and pumped storage · Keadby Generation Limited
1.4 GWAwaiting Consents Ferrybridge C 275kV Substation
National Grid (England & Wales)
Jun 2034
Intog 2
Offshore wind · Cerulean Winds Limited
1.4 GWScoping Near Branxton 400kV Substation
SP Transmission (south Scotland)
Jun 2032
Overton Solar & Storage Farm
Solar + storage · Elements Green Limited
1.4 GWScoping Overton 275kV
National Grid (England & Wales)
Jun 2032
Tealing Energy Park
Battery storage · Onpath Energy Limited
1.4 GWScoping Tealing 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Trafford 2 BESS
Battery storage · Future Point Manchester Limited
1.4 GWScoping Carrington 400KV Substation
National Grid (England & Wales)
Oct 2038
Cronos
Interconnector · Cronos Energy Ltd
1.4 GWScoping Kemsley 400kV Substation
National Grid (England & Wales)
Oct 2029
Low Carbon Link
Interconnector · Low Carbon Solar Park 39 Limited
1.4 GWScoping South Wales West Connection Node C 400Kv Substation
National Grid (England & Wales)
Oct 2037
NorthConnect
Interconnector · Northconnect Limited
1.4 GWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Mar 2030
Tarchon
Interconnector · Tarchon Energy Limited
1.4 GWScoping East Anglia Connection Node 400kV Substation
National Grid (England & Wales)
Oct 2030
Berwick Bank Offshore Wind Farm A
Offshore wind · Berwick Bank A Limited
1.4 GWScoping Branxton 400kV Substation
SP Transmission (south Scotland)
Oct 2029
Berwick Bank Offshore Wind Farm B
Offshore wind · Berwick Bank B Limited
1.4 GWScoping Branxton 400kV Substation
SP Transmission (south Scotland)
Jun 2031
Cenos
Offshore wind · Flotation Energy Limited
1.4 GWScoping Peterhead 400kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Scira-Dudgeon Extension
Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited
1.4 GWScoping Norwich Main 400kV Substation
National Grid (England & Wales)
Oct 2034
NatPower Kinoulton Green Energy Park
Battery storage · Dalby Energy Limited
1.3 GWScoping West Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Isle of Man Offshore Wind Farm
Offshore wind · Mooir Vannin Offshore Wind Farm Limited
1.3 GWScoping Imw01 Offshore 275/66Kv Offshore Substation
National Grid (England & Wales)
Sep 2037
Norfolk Boreas
Offshore wind · Norfolk Boreas Limited
1.3 GWScoping Necton 400kV Substation
National Grid (England & Wales)
Dec 2030
Ossian 1 Offshore Wind Farm
Offshore wind · Ossian Offshore Wind Farm Limited
1.3 GWScoping Brechin 400/275 kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Immingham
Battery storage · Vpi Immingham LLP
1.3 GWScoping Humber Refinery 400kV Substation
National Grid (England & Wales)
Oct 2028
FAB Link Interconnector
Interconnector · FAB Link Limited
1.3 GWAwaiting Consents Exeter 400kV Substation
National Grid (England & Wales)
Sep 2032
Coire Glas Pumped Storage
Hydro and pumped storage · Coire Glas Hydro Pumped Storage Limited
1.3 GWScoping Coire Glas GSP
SSEN Transmission (north Scotland)
Oct 2029
Little Horsted Energy Park
Solar + storage · Elements Green Development Ltd
1.3 GWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Seneca
Interconnector · Frontier Power International Limited
1.3 GWScoping Mablethorpe 400kV Substation
National Grid (England & Wales)
Nov 2031
Cold Norton
Solar + storage · Bsr Applications Limited
1.3 GWScoping South Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2036
Ferrybridge D
Hydro and pumped storage · Keadby Generation Limited
1.2 GWScoping Ferrybridge C 275kV Substation
National Grid (England & Wales)
Oct 2030
Bellrock Offshore Wind Farm
Offshore wind · Bellrock Offshore Wind Farm Limited
1.2 GWScoping Hurlie 400kV substation
SSEN Transmission (north Scotland)
Oct 2032
Legacy Green Energy Centre
Battery storage · Legacy Green Energy Limited
1.2 GWAwaiting Consents Legacy 400kV Substation
National Grid (England & Wales)
Oct 2037
Rampion Extension Offshore Wind Farm
Offshore wind · Rampion Extension Development Limited
1.2 GWScoping Bolney 400kV Substation
National Grid (England & Wales)
Dec 2029
The Beacon
Solar + storage · Beacon Solar Limited
1.2 GWScoping West Country Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2037
Vicarage Drove BESS
Battery storage · UK Transition Power Holdings Limited
1.2 GWScoping Trent Valley South Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Berwick Bank Offshore Wind Farm A
Offshore wind · Berwick Bank A Limited
1.2 GWScoping Branxton 400kV Substation
SP Transmission (south Scotland)
Oct 2028
Berwick Bank Offshore Wind Farm B
Offshore wind · Berwick Bank B Limited
1.2 GWScoping Branxton 400kV Substation
SP Transmission (south Scotland)
Oct 2029
Awel Y Mor
Offshore wind · Awel Y Mor Offshore Wind Farm Limited
1.1 GWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Mar 2030
Five Estuaries Offshore Wind Farm
Offshore wind · Five Estuaries Offshore Wind Farm Limited
1.1 GWScoping Five Estuaries 220/66 kV Offshore Substation
National Grid (England & Wales)
Oct 2030
Bradwell Energy Park
Solar + storage · Low Carbon Solar Park 28 Limited
1.1 GWScoping Rayleigh 400kV Substation
National Grid (England & Wales)
Oct 2034
Project Cobalt
Interconnector · Getlink Projects 2 Limited
1.1 GWScoping East Kent Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2036
Butlers Wood Green Energy Centre
Solar + storage · Butlers Wood Ng Limited
1.0 GWAwaiting Consents Butlers Wood 400kV Substation
National Grid (England & Wales)
Oct 2031
Cilfynydd Green Energy Centre
Solar + storage · Cilfynydd Ng Limited
1.0 GWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2033
Drakelow Green Energy Centre
Solar + storage · Drakelow Ng Limited
1.0 GWAwaiting Consents Drakelow 400kV Substation
National Grid (England & Wales)
Oct 2029
East Claydon Green Energy Centre
Solar + storage · East Claydon Green Ng Limited
1.0 GWAwaiting Consents East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2034
Enderby Green Energy Centre
Solar + storage · Enderby BESS Limited
1.0 GWAwaiting Consents Enderby 400kV Substation
National Grid (England & Wales)
Oct 2028
Feckenham Green Energy Centre
Solar + storage · Feckenham Green Ng Limited
1.0 GWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2032
Hams Hall Green Energy Centre
Solar + storage · Hams Hall Ng Limited
1.0 GWScoping Hams Hall 400kV Substation
National Grid (England & Wales)
Oct 2032
Page 2 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.