OFFSHORE WIND Β· SPTIntog 2
Intog 2 is a 1.4 GW offshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Near Branxton 400kV Substation, with capacity due from June 2032. The connection agreement is held by Cerulean Winds Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004514
- Customer
- Cerulean Winds Limited
- Technology
- Wind Offshore
- Total capacity
- 1.4 GW
- Change in this agreement
- +1.4 GW
- Capacity effective from
- 30 June 2032
- Connection site
- Near Branxton 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Near Branxton 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem