Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Project map
Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.
National Grid is refining plans for a new British–Belgian subsea electricity connection. The earlier Suffolk connection agreement was removed; that should not be reported as the cancellation of all Nautilus development. Current route and converter options require further confirmation.
Nemo Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.
Construction is underway on this gas-fired combined-cycle plant with integrated carbon capture. The developer targets start-up in 2028 and up to 742 MW output. Captured CO₂ would use Northern Endurance Partnership transport and storage. It is a fossil-fuel project with carbon capture, not renewable generation.