WIND Β· OPERATIONAL

Neilston (GB)

Neilston (GB) is a 10 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningNov 2009 (completed)
  2. ConsentedMay 2011 (completed)
  3. ConstructionMar 2012 (completed)
  4. OperatingMay 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
G78 4BZ
Coordinates
55.7541, -4.4667

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Neilston (GB) compares

326th of 488largest wind farms in the UK register
171st of 199in Scotland
0.03%of listed UK wind farms capacity
β‰ˆ 23 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
NEILSTON WIND FARM
Developer / operator
Renewables Infrastructure Group
Planning authority
East Renfrewshire
Planning reference
2009/0744/TP
Application submitted
19 November 2009
Permission granted
16 May 2011
Construction started
1 March 2012
Began operating
13 May 2013
Capacity in planning record
9.2 MW
Address
N/w Of Nether Carswell Farm, Drumgrain Tip, Kingston Road, Neilston, Glasgow, Strathclyde, G44, Strathclyde
REPD reference
3857

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.