11,163Matching project records
3,152Operating records
477Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

11,163 results

Understand capacity and annual energy →
Grid upgrades

Netherton / Longside 400 kV and 132 kV AC Substations

Under construction
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

The two AC substations at Netherton Hub support generation and storage connections and onward transmission. They form a different infrastructure package from the site’s HVDC converters. Shared site civil works are underway; detailed electrical approvals and energisation follow separately.

Grid upgrades

Netherton / Longside EGL3 HVDC Converter

Consented
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

A separate converter at Netherton Hub is proposed for the 2 GW EGL3 link to West Norfolk. It is distinct from the Spittal–Peterhead converter on the same hub site and from EGL2’s converter at Boddam. The hub has entered civil construction, while EGL3’s marine licence and detailed delivery stages remain separate.

Grid upgrades

Netherton / Longside Spittal–Peterhead HVDC Converter

Consented
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

This converter is planned within Netherton Hub near Longside as the southern terminal of the 2 GW, 525 kV Spittal–Peterhead link. The cable comes ashore near Crimond at Rattray Head. Hub civil works are underway; this record does not imply the converter is installed or energised.

Grid upgrades

Netherton Hub / Longside substations and HVDC converters

Under construction
Not published

Multiple substations and converters

Longside / Flushing / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

Main hub construction is underway near Longside, west of Peterhead. The development comprises 400 kV and 132 kV substations, separate Spittal–Peterhead and EGL3 HVDC converter stations, a transmission hall identified for EGL5, and an operations and spares base. Shared site earthworks do not mean that every converter or cable is already operational.

Interconnectors

NeuConnect (Great Britain–Germany)

Under construction
1,400 MW

Transfer capacity

Kent / Germany · United Kingdom

NeuConnect

Converter fit-out was reported in September 2026. NeuConnect is the first direct electricity connection between Great Britain and Germany, with approximately 725 km of land and subsea cables. It supports imports or exports according to system conditions.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule