WIND Β· OPERATIONAL

New Albion

New Albion is a 14.4 MW onshore wind farm in East Midlands England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England

Key facts

Installed capacity
14.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NN14 1QP
Coordinates
52.4457, -0.7703

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How New Albion compares

280th of 488largest wind farms in the UK register
13th of 34in East Midlands
0.05%of listed UK wind farms capacity
β‰ˆ 33 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 14.4 MW station would generate roughly 33 GWh of electricity in a year, similar to the annual use of about 12,110 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
New Albion Wind Farm
Developer / operator
John Laing Environmental Assets Group
Planning authority
North Northamptonshire
Planning reference
KET/2009/0549
Application submitted
29 August 2009
Permission granted
20 January 2010
Construction started
1 January 2015
Began operating
18 January 2016
Capacity in planning record
14.4 MW
Address
Agricultural land at Towns Close Farm, between Pipewell and Rushton and close to the A6003 Road to Corby, Northamptonshire, NN14 1QT
REPD reference
4513

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026