WIND Β· OPERATIONAL

Burton Wold

Burton Wold is a 14.4 MW onshore wind farm in East Midlands England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England

Key facts

Installed capacity
14.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NN15 5PJ
Coordinates
52.3616, -0.6518

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Burton Wold compares

278th of 488largest wind farms in the UK register
12th of 34in East Midlands
0.05%of listed UK wind farms capacity
β‰ˆ 33 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 14.4 MW station would generate roughly 33 GWh of electricity in a year, similar to the annual use of about 12,150 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Burton Wold Windfarm
Developer / operator
Gravis Capital Management
Planning authority
North Northamptonshire
Planning reference
KE/03/0559
Application submitted
23 March 2004
Permission granted
23 March 2004
Construction started
1 December 2005
Began operating
1 April 2006
Capacity in planning record
20 MW
Address
Felaw Maltings, Felaw Street, Ipswich, Northamptonshire, IP2 8SJ
REPD reference
4672

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.