Battery Storage

Nether Moor Field

Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire, South Yorkshire, S66

Nether Moor Field is a 49.9 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Thurcroft Energy (Max Design Consultancy). It is recorded as operational since September 2020. The determining authority is Rotherham, reference RB2017/1426.…

Operational Β· Since 2020
Project stageOperating
  1. PlanningSep 2017 (completed)
  2. ConsentedDec 2017 (completed)
  3. Construction (completed)
  4. OperatingSep 2020 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2020-05-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Power Capacity
2020
Commissioned

πŸ“‹ Project Overview

Nether Moor Field is a 49.9 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Thurcroft Energy (Max Design Consultancy). It is recorded as operational since September 2020. The determining authority is Rotherham, reference RB2017/1426.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperThurcroft Energy (Max Design Consultancy)
Owner / operatorThurcroft Energy (Max Design Consultancy)
Year consented2017
Commissioned / target2020
LocationNether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire, South Yorkshire, S66
RegionYorkshire and Humber
Coordinates53.401251Β°N, 1.2682799Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2017-09-29
2017-12-21
2020-09-01