Thermal & carbon capture Β· Teesside

Net Zero Teesside Power

Under construction

Construction is underway on this gas-fired combined-cycle plant with integrated carbon capture. The developer targets start-up in 2028 and up to 742 MW output. Captured COβ‚‚ would use Northern Endurance Partnership transport and storage. It is a fossil-fuel project with carbon capture, not renewable generation.

Sources reviewed 2026-10-08 Β· bp / Equinor

Project facts

StatusUnder construction
Developer / operatorbp / Equinor
RegionTeesside
CountryEngland
Published rating742 MW
Rating definitionPublished generating capacity
Connection / routeTransmission connection; metered project output not provided here
Delivery target2028 (developer target; subject to change)

Generation and storage

Construction is underway on this gas-fired combined-cycle plant with integrated carbon capture. The developer targets start-up in 2028 and up to 742 MW output. Captured COβ‚‚ would use Northern Endurance Partnership transport and storage. It is a fossil-fuel project with carbon capture, not renewable generation.

Published power is a proposal or nameplate rating, not measured output. Construction, grid connection and operation require separate evidence.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. bp / Equinor current project update
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source