Project facts
| Status | Under construction |
|---|---|
| Developer / operator | bp / Equinor |
| Region | Teesside |
| Country | England |
| Published rating | 742 MW |
| Rating definition | Published generating capacity |
| Connection / route | Transmission connection; metered project output not provided here |
| Delivery target | 2028 (developer target; subject to change) |
Generation and storage
Construction is underway on this gas-fired combined-cycle plant with integrated carbon capture. The developer targets start-up in 2028 and up to 742 MW output. Captured COβ would use Northern Endurance Partnership transport and storage. It is a fossil-fuel project with carbon capture, not renewable generation.
Published power is a proposal or nameplate rating, not measured output. Construction, grid connection and operation require separate evidence.
Project location
The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.
Loading OpenStreetMapβ¦
- Net Zero Teesside Power development site Mapped site / infrastructure feature Open larger map Location source Coordinate source 54.62129, -1.11837 Β· WGS84
Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2βs additional outlines and route layers are explicitly identified in the developerβs map data.
Sources and review date
- bp / Equinor current project update
Reviewed 2026-10-08
How Octary distinguishes proposals, published ratings and live measurements