Nether Mill is a 3.77 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 3.77 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX15 2QQ
- Coordinates
- 50.9016, -3.3937
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Nether Mill compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.77 MW station would generate roughly 3.3 GWh of electricity in a year, similar to the annual use of about 1,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoNearby generating sites
- Kia-Ora Farm Β· 1.8 MW solar farm5.3 km
- Higher Pirzwell Β· 1.2 MW solar farm6.3 km
- Barton Β· 1.2 MW solar farm7.5 km
- Palfreys Barton Β· 0.96 MW solar farm8.0 km
- RedHill Farm Β· 4.8 MW solar farm8.7 km
- Dunkeswell Β· 2.8 MW solar farm12.4 km
- West Bradley Β· 1.03 MW solar farm12.5 km
- Francis Court Β· 4.22 MW solar farm13.2 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Nether Mill Farm
- Developer / operator
- AEE Renewables
- Planning authority
- Mid Devon
- Planning reference
- 12/01518/MFUL
- Application submitted
- 31 October 2012
- Permission granted
- 19 February 2014
- Began operating
- 1 September 2014
- Capacity in planning record
- 3.1 MW
- Address
- Halberton, Devon, EX15 2QQ
- REPD reference
- 1303
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.