West Bradley

West Bradley is a 1.03 MW solar farm in South West England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningMar 2012 (completed)
  2. ConsentedMay 2012 (completed)
  3. ConstructionJun 2012 (completed)
  4. OperatingAug 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
1.03 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EX16 8BJ
Coordinates
50.9163, -3.5707

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How West Bradley compares

644th of 662largest solar farms in the UK register
184th of 192in South West
0.02%of listed UK solar farms capacity
β‰ˆ 0.9 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 1.03 MW station would generate roughly 0.9 GWh of electricity in a year, similar to the annual use of about 330 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
West Bradley Farm
Developer / operator
Lightsource Renewable Energy
Planning authority
Mid Devon
Planning reference
12/00415/MFUL
Application submitted
16 March 2012
Permission granted
18 May 2012
Construction started
14 June 2012
Began operating
3 August 2012
Capacity in planning record
1.5 MW
Address
Templeton, Tiverton, Devon, Devon, EX16 8BJ
REPD reference
1445

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.