United States › Power plants › Battery storage
OCTARY USA · BATTERY STORAGECancelled battery storage sites in the USA — page 2
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating1,086plants
Operating capacity56.1 GWnameplate
Under construction23.3 GW230 plants
Whole pipeline64.2 GWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
142 plants · page 2 of 3
| Plant | Capacity | Stage |
|---|---|---|
| Forest Grove - Dodd | 100 MW | Withdrawn / abandoned |
| Alamo 3 BESS 2 | 100 MW | Withdrawn / abandoned |
| Alamo 4 BESS | 100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 1 | 100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 2 | 100 MW | Withdrawn / abandoned |
| Beaver Creek Wind Facility | 100 MW | Withdrawn / abandoned |
| Berkman Storage | 100 MW | Withdrawn / abandoned |
| Big Elm Storage | 100 MW | Withdrawn / abandoned |
| Buena Vista Energy LLC | 100 MW | Withdrawn / abandoned |
| Clermont | 100 MW | Withdrawn / abandoned |
| Cooper Canyon Renewable Energy | 100 MW | Withdrawn / abandoned |
| Haymaker Hybrid | 100 MW | Withdrawn / abandoned |
| Holly Branch Solar, LLC | 100 MW | Withdrawn / abandoned |
| May Renewables | 100 MW | Withdrawn / abandoned |
| Sandman Solar | 100 MW | Withdrawn / abandoned |
| TX 14 Venus Mill Storage | 100 MW | Withdrawn / abandoned |
| TX17 Nickel Prairie Storage | 100 MW | Withdrawn / abandoned |
| TX18 Cottage Meadow Storage | 100 MW | Withdrawn / abandoned |
| Iris Solar | 90.0 MW | Withdrawn / abandoned |
| Chiquito Grid, LLC | 80.0 MW | Withdrawn / abandoned |
| Echelon Solar | 80.0 MW | Withdrawn / abandoned |
| Cedar Range Solar | 75.7 MW | Withdrawn / abandoned |
| Darien Solar | 75.0 MW | Withdrawn / abandoned |
| Trinity River Solar 1 | 75.0 MW | Withdrawn / abandoned |
| Uvalde 2 BESS 1 | 75.0 MW | Withdrawn / abandoned |
| Colleton Solar | 74.9 MW | Withdrawn / abandoned |
| Peony Solar 1 | 62.5 MW | Withdrawn / abandoned |
| Orange Grove | 61.0 MW | Withdrawn / abandoned |
| Oriana Solar LLC | 61.0 MW | Withdrawn / abandoned |
| Kupehau | 60.0 MW | Withdrawn / abandoned |
| Kobernat Solar and Storage | 51.5 MW | Withdrawn / abandoned |
| Lupinus Storage 3 | 50.9 MW | Withdrawn / abandoned |
| Stegall Solar and Storage | 50.5 MW | Withdrawn / abandoned |
| Crossroads Solar | 50.0 MW | Withdrawn / abandoned |
| Hornshadow Solar II, LLC | 50.0 MW | Withdrawn / abandoned |
| Kingston Energy Storage, LLC | 50.0 MW | Withdrawn / abandoned |
| Peeler Solar, LLC | 50.0 MW | Withdrawn / abandoned |
| Quest Solar | 50.0 MW | Withdrawn / abandoned |
| Mulligan Solar, LLC | 40.0 MW | Withdrawn / abandoned |
| Santa Ana Storage 3 | 40.0 MW | Withdrawn / abandoned |
| Vermillion Rise Solar | 40.0 MW | Withdrawn / abandoned |
| Vernon Solar and Storage | 38.0 MW | Withdrawn / abandoned |
| Hooper Solar and Storage | 30.7 MW | Withdrawn / abandoned |
| Deer Wood Storage, LLC | 30.0 MW | Withdrawn / abandoned |
| Hornshadow Solar, LLC | 25.0 MW | Withdrawn / abandoned |
| Mission Rock Energy Center Hybrid | 25.0 MW | Withdrawn / abandoned |
| Pike Solar Hybrid | 25.0 MW | Withdrawn / abandoned |
| EnerSmart Murray BESS | 21.0 MW | Withdrawn / abandoned |
| Powell Solar | 20.5 MW | Withdrawn / abandoned |
| Alfred Oaks Solar, LLC | 20.0 MW | Withdrawn / abandoned |
Page 2 of 3
← Previous Next →
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Solar Proponent LLC4 plants · 2,084 MW
- Consolidated Edison Development Inc.11 plants · 1,227 MW
- Alpin Holding LLC8 plants · 1,060 MW
- Cypress Creek Renewables6 plants · 1,000 MW
- MS11 plants · 756 MW
- Belltown Power Texas 2, LLC6 plants · 587 MW
- Key Capture Energy5 plants · 520 MW
- Nevada Power Co2 plants · 480 MW
- Parliament Energy Holdings LLC1 plants · 460 MW
- 210MS 8me, LLC1 plants · 400 MW
- 174 Power Global Corp.2 plants · 360 MW
- Vesper Energy Development LLC2 plants · 350 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map