United States βΊ Power plants βΊ Solar farms βΊ Colorado
SOLAR FARMSPike Solar Hybrid
Pike Solar Hybrid is a 175 MW operating solar farm in El Paso County, Colorado, operated by Deriva Energy.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CO465 | Solar Photovoltaic | 175 MW | |
| PSBES | Batteries | 25 MW | Cancelled or postponed |
Plant details
- Operator
- Deriva Energy
- Location
- El Paso County, Colorado
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 175 MW
Cancelled: 25.0 MW - First unit online
- Dec 2023
- EIA plant ID
- 64212
Location
38.6217, -104.5814
Nearby power plants
- Palmer SolarSolar farms Β· 60.0 MW Β· 3.9 mi
- Clear Spring Ranch PV ProjectSolar farms Β· 10.0 MW Β· 6.3 mi
- Ray D NixonCoal power plants, Gas power plants Β· 283 MW Β· 6.8 mi
- Front Range Power PlantGas power plants Β· 554 MW Β· 6.8 mi
- Fountain Valley Power FacilityGas power plants Β· 228 MW Β· 7.3 mi
- Drennan Energy StorageBattery storage Β· 100 MW Β· 11.4 mi
- HorizonGas power plants Β· 480 MW Β· 11.5 mi
- Carson Solar ISolar farms Β· 2.0 MW Β· 12.9 mi
- Fort Carson Battery Energy Storage SysteBattery storage Β· 4.2 MW Β· 13.6 mi
- Pikes Peak Solar Garden 1 LLC CSGSolar farms Β· 2.0 MW Β· 13.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem