πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Colorado

SOLAR FARMS

Pike Solar Hybrid

Pike Solar Hybrid is a 175 MW operating solar farm in El Paso County, Colorado, operated by Deriva Energy.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2023 (current stage)
  5. Closed (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore solar farms in Colorado

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
CO465Solar Photovoltaic175 MW OperatingDec 2023
PSBESBatteries25 MW Cancelled or postponed

Plant details

Operator
Deriva Energy
Location
El Paso County, Colorado
Balancing authority
PSCO
Sector
IPP Non-CHP
Capacity
Operating: 175 MW
Cancelled: 25.0 MW
First unit online
Dec 2023
EIA plant ID
64212

Location

38.6217, -104.5814

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem