🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage

OCTARY USA · BATTERY STORAGE

Battery storage sites in the USA — page 14

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating1,086plants
Operating capacity56.1 GWnameplate
Under construction23.3 GW230 plants
Whole pipeline64.2 GWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

1,552 plants · page 14 of 32
PlantCapacityStageStateOwner / operatorYear
Padua 1 50.0 MW
200 MWh
Operating TX
Bexar
Padua 1 2025
Pueblo Airport Generating Station 50.0 MW In planning CO
Pueblo
Black Hills Service Company LLC 2027
Richwood Solar and Storage 50.0 MW In planning OH
Union
Samsung C&T Renewables, LLC 2028
Ridgely Energy Farm 50.0 MW In planning TN
Lake
Leeward Asset Management, LLC 2029
Ryan Storage 50.0 MW Under construction TX
Coryell
Ryan Storage LLC 2027
Shallow Basket 50.0 MW
200 MWh
Operating NM
Rio Arriba
Shallow Basket Energy, LLC 2025
Sky Ranch Solar 50.0 MW
200 MWh
Operating NM
Valencia
Sky Ranch Solar and Storage 2024
Steele Flats Energy Storage 50.0 MW Under construction NE
Jefferson
Steele Flats Energy Storage, LLC 2026
Sundance (CO) 50.0 MW Under construction CO
Elbert
Cypress Creek Renewables 2026
Tortolas 50.0 MW
50 MWh
Operating TX
Brazoria
Engie North America 2024
TREX US Red Holly 50.0 MW In planning TX
Lynn
TREX US Red Holly LLC 2027
Two Oaks Solar and Storage LLC 50.0 MW In planning VA
Louisa
Two Oaks Solar and Storage 2027
TX11 Republic Road Storage 50.0 MW
50 MWh
Operating TX
Robertson
Key Capture Energy 2022
TX13 Endurance Park Storage 50.0 MW
50 MWh
Operating TX
Scurry
Key Capture Energy 2022
TX19 River Valley Storage 1 50.0 MW
111 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX21 River Valley Storage 2 50.0 MW
107 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX23 Roughneck Storage 50.0 MW
50 MWh
Operating TX
Brazoria
Key Capture Energy 2022
Ventasso Energy Storage, LLC 50.0 MW
200 MWh
Operating CA
San Diego
RWE Americas, LLC 2026
Victory Pass 50.0 MW
200 MWh
Operating CA
Riverside
Victory Pass I, LLC 2024
Wildcat Solar Power Plant LLC 50.0 MW In planning NM
McKinley
Solariant Capital, LLC 2028
Bayonne Energy Center 49.8 MW Under construction NJ
Hudson
Bayonne Energy Center LLC 2027
Moody Air Force Base Solar 49.5 MW
198 MWh
Operating GA
Lowndes
Georgia Power Co 2026
Route 66 Energy Storage 49.5 MW
198 MWh
Operating NM
Cibola
Route 66 Energy Storage 2025
Blythe Solar IV, LLC 47.0 MW
47 MWh
Operating CA
Riverside
Blythe Solar IV, LLC 2022
Edwards Sanborn E5 47.0 MW
188 MWh
Operating CA
Kern
Terra-Gen Operating Co-Hybrid 2023
Sanborn BESS 4 47.0 MW
188 MWh
Operating CA
Kern
Terra-Gen Operating Co-BESS 2023
Soldotna 46.5 MW
93 MWh
Operating AK
Kenai Peninsula
Homer Electric Assn Inc 2022
Cavalry Solar Hybrid 45.0 MW
180 MWh
Operating IN
White
Cavalry Energy Center LLC 2024
KCE CT 1, LLC 45.0 MW In planning CT
Windham
Key Capture Energy 2031
Lockhart ESS, LLC 45.0 MW
180 MWh
Operating CA
San Bernardino
Terra-Gen Operating Co-Solar 2024
Dynegy Oakland Power Plant 43.3 MW In planning CA
Alameda
Dynegy Oakland, LLC 2028
Red Rock 41.0 MW
164 MWh
Operating AZ
Maricopa
Arizona Public Service Co 2023
Shutler Energy Storage 41.0 MW Under construction OR
Gilliam
Avangrid Power LLC 2028
Zier Solar 40.4 MW
80 MWh
Operating TX
Kinney
Cypress Creek Renewables 2024
2W Permian Solar Project Hybrid 40.0 MW
40 MWh
Operating TX
Andrews
2W Permian Solar, LLC 2021
Angela Solar Project 40.0 MW
80 MWh
Operating CA
Tulare
Angiola East LLC 2026
Battery Energy Storage System 40.0 MW
11 MWh
Operating AK
Fairbanks North Star
Golden Valley Elec Assn Inc 2003
BigBeau Solar, LLC 40.0 MW
160 MWh
Operating CA
Kern
Big Beau Solar, LLC 2022
Black Mesa BESS 40.0 MW
160 MWh
Operating ID
Elmore
Idaho Power Co 2024
Cool Springs Solar (Hybrid) 40.0 MW
80 MWh
Operating GA
Decatur
Cool Springs Solar, LLC 2021
EDPR CA Solar Park VI LLC (CA) Hybrid 40.0 MW Under construction CA
Fresno
EDPR CA Solar Park VI LLC 2026
Edwards Sanborn S1 40.0 MW
84 MWh
Operating CA
Kern
Terra-Gen Operating Co-Hybrid 2022
Fallbrook Energy Storage 40.0 MW
40 MWh
Operating CA
San Diego
San Diego Gas & Electric Co 2023
Hickory Park Solar Hybrid 40.0 MW
80 MWh
Operating GA
Mitchell
RWE Americas, LLC 2022
International Battery Substation (IBSS) 40.0 MW
80 MWh
Operating AK
Anchorage
Chugach Electric Assn Inc 2024
Lake Mabel Solar and Battery Storage 40.0 MW
103 MWh
Operating FL
Polk
Tampa Electric Co 2025
Resurgence Solar II 40.0 MW
300 MWh
Operating CA
San Bernardino
Resurgence Solar II 2023
Sagebrush Solar 2 ESS 40 40.0 MW
160 MWh
Operating CA
Kern
Terra-Gen Operating Co-BESS 2 2024
Scarlet Solar (CA) 40.0 MW
200 MWh
Operating CA
Fresno
EDP Renewables North America LLC 2024
Scott Solar Farm 40.0 MW
48 MWh
Operating VA
Powhatan
Dominion Energy Inc. 2022
Page 14 of 32

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map