πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage β€Ί Texas

BATTERY STORAGE

Padua 1

Padua 1 is a 50.0 MW operating battery storage site in Bexar County, Texas, operated by Padua 1. Its batteries store up to 200 MWh.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJul 2025 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore battery storage sites in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
12341Batteries50 MW
200 MWh
OperatingJul 2025

Plant details

Operator
Padua 1
Location
Bexar County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Operating: 50.0 MW
First unit online
Jul 2025
EIA plant ID
68912

Location

29.3251, -98.3256

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem