United States › Power plants › Solar farms › Texas
SOLAR FARMS · BATTERY STORAGE2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid is a 460 MW operating solar and battery storage plant in Andrews County, Texas, operated by 2W Permian Solar, LLC. Its batteries store up to 40 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 2WPSO | Solar Photovoltaic | 420 MW | |
| 2WPBA | Batteries | 40 MW 40 MWh |
Plant details
- Operator
- 2W Permian Solar, LLC
- Location
- Andrews County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 460 MW
- First unit online
- Aug 2021
- EIA plant ID
- 63255
Location
32.1164, -102.5283
Nearby power plants
- Ector County Energy CenterGas power plants · 359 MW · 4.7 mi
- Oxy Renewable Energy - GoldsmithSolar farms · 16.8 MW · 10.1 mi
- GoldsmithOil-fired power plants · 9.0 MW · 11.6 mi
- BakkeOil-fired power plants · 9.0 MW · 12.4 mi
- N. Mary FrancisOil-fired power plants · 9.0 MW · 14.6 mi
- TumbleweedOil-fired power plants · 9.0 MW · 16.3 mi
- OdessaBattery storage · 9.9 MW · 18.6 mi
- WAL537Gas power plants · 1.2 MW · 19.1 mi
- Notrees Windpower HybridBattery storage, Wind farms · 189 MW · 19.5 mi
- WestoverOil-fired power plants · 9.0 MW · 19.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem