ONSHORE WIND Β· SPP

Onshore wind project GEN-2018-008, Mcintosh County

Onshore wind project GEN-2018-008, Mcintosh County is a 252 MW onshore wind request withdrawn in the SPP interconnection queue, in Mcintosh County, North Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-008
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Groton-Leland Olds 345kV Line
Location
Mcintosh County, North Dakota
Technology
Wind: 252 MW
Total requested
252 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 April 2018
Proposed online date
June 2025
Came online
June 2025
Withdrawn
January 2024

Location

Marker shows the centre of Mcintosh County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Mcintosh County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem