ONSHORE WIND Β· WESTOnshore wind project GI-0115, Mcintosh County
Onshore wind project GI-0115, Mcintosh County is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Mcintosh County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0115
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ellendale
- Location
- Mcintosh County, North Dakota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 9 November 2001
Location
Marker shows the centre of Mcintosh County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mcintosh County
- Onshore wind project J1040, Mcintosh CountyOnshore wind Β· 250 MW Β· under construction
- Other project G150, Mcintosh CountyOther Β· 12.0 MW Β· in study
- Coal project GI-0111, Mcintosh CountyCoal Β· 750 MW Β· withdrawn
- Onshore wind project GI-0114, Mcintosh CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2018-008, Mcintosh CountyOnshore wind Β· 252 MW Β· withdrawn
- Onshore wind project J209, Mcintosh CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project G988, Mcintosh CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G624, Mcintosh CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GI-0812, Mcintosh CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project J929, Mcintosh CountySolar Β· 25.0 MW Β· withdrawn
- Onshore wind project G283, Mcintosh CountyOnshore wind Β· 19.0 MW Β· withdrawn
- Onshore wind project G307, Mcintosh CountyOnshore wind Β· 19.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem