United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project G307, Mcintosh County

Onshore wind project G307, Mcintosh County is a 19.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Mcintosh County, North Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2003 (completed)
  2. Withdrawn / abandonedJun 2003 (project stopped here)
  3. ConsentedJun 2003 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G307
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Mcintosh County, North Dakota
Technology
Wind: 19.0 MW
Total requested
19.0 MW
Queue status
Withdrawn
Entered queue
12 March 2003
Agreement signed
3 June 2003
Proposed online date
June 2004
Withdrawn
June 2003

Location

Marker shows the centre of Mcintosh County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Mcintosh County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem