United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR Β· WEST

Solar project 751, Box Elder County

Solar project 751, Box Elder County is a 180 MW solar request withdrawn in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
751
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Bridgerland substation
Location
Box Elder County, Utah
Technology
Solar: 180 MW
Total requested
180 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
25 May 2016
Proposed online date
December 2020

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem