United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project 978, Box Elder County
Solar + storage project 978, Box Elder County is a 525 MW solar + storage request withdrawn in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 978
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Ben Lomond-Populus #2 line
- Location
- Box Elder County, Utah
- Technology
- Solar: 525 MW Β· Battery
- Total requested
- 525 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN - LACK OF READINESS
- Queue status
- Withdrawn
- Entered queue
- 20 November 2017
- Proposed online date
- December 2020
Location
Marker shows the centre of Box Elder County; the queue data does not give exact sites.
Other requests in Box Elder County
- Solar + storage project 754, Box Elder CountySolar + storage Β· 80.0 MW Β· agreement signed
- Nuclear project T2-013, Box Elder CountyNuclear Β· 500 MW Β· in study
- Onshore wind project BPA, Box Elder CountyOnshore wind Β· 95.0 MW Β· in study
- Battery storage project S0031, Box Elder CountyBattery storage Β· 80.0 MW Β· in study
- Solar project T2-058, Box Elder CountySolar Β· 10.0 MW Β· in study
- Solar + storage project 799, Box Elder CountySolar + storage Β· 67.0 MW Β· suspended
- Solar + storage project 862, Box Elder CountySolar + storage Β· 45.0 MW Β· suspended
- Solar project 753, Box Elder CountySolar Β· 80.0 MW Β· built
- Solar project 1030, Box Elder CountySolar Β· 2.0 MW Β· built
- Onshore wind project 282, Box Elder CountyOnshore wind Β· 0.0 MW Β· built
- Battery storage project 1167, Box Elder CountyBattery storage Β· 650 MW Β· withdrawn
- Battery storage project 1166, Box Elder CountyBattery storage Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem