πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR + STORAGE Β· WEST

Solar + storage project 978, Box Elder County

Solar + storage project 978, Box Elder County is a 525 MW solar + storage request withdrawn in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
978
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Ben Lomond-Populus #2 line
Location
Box Elder County, Utah
Technology
Solar: 525 MW Β· Battery
Total requested
525 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN - LACK OF READINESS
Queue status
Withdrawn
Entered queue
20 November 2017
Proposed online date
December 2020

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem