BATTERY STORAGE · WESTBattery storage project S0031, Box Elder County
Battery storage project S0031, Box Elder County is a 80.0 MW battery storage request in interconnection study in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.
Queue statusIn planning
- PlanningQueued Aug 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S0031
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Lampo substation
- Location
- Box Elder County, Utah
- Technology
- Battery: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 2 August 2024
- Proposed online date
- December 2026
Location
Marker shows the centre of Box Elder County; the queue data does not give exact sites.
Other requests in Box Elder County
- Solar + storage project 754, Box Elder CountySolar + storage · 80.0 MW · agreement signed
- Nuclear project T2-013, Box Elder CountyNuclear · 500 MW · in study
- Onshore wind project BPA, Box Elder CountyOnshore wind · 95.0 MW · in study
- Solar project T2-058, Box Elder CountySolar · 10.0 MW · in study
- Solar + storage project 799, Box Elder CountySolar + storage · 67.0 MW · suspended
- Solar + storage project 862, Box Elder CountySolar + storage · 45.0 MW · suspended
- Solar project 753, Box Elder CountySolar · 80.0 MW · built
- Solar project 1030, Box Elder CountySolar · 2.0 MW · built
- Onshore wind project 282, Box Elder CountyOnshore wind · 0.0 MW · built
- Battery storage project 1167, Box Elder CountyBattery storage · 650 MW · withdrawn
- Solar + storage project 978, Box Elder CountySolar + storage · 525 MW · withdrawn
- Battery storage project 1166, Box Elder CountyBattery storage · 400 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem