United States › Grid › Interconnection queues › Utah
SOLAR + STORAGE · WESTSolar + storage project 799, Box Elder County
Solar + storage project 799, Box Elder County is a 67.0 MW solar + storage request suspended in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.
Queue statusPaused / redesign
- PlanningQueued Sep 2016 (current stage)
- ConsentedSep 2019 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 799
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Steel Solar, LLC
- Connection point (POI)
- Wheelon - Nucor transmission line
- Location
- Box Elder County, Utah
- Technology
- Solar: 67.0 MW · Battery
- Total requested
- 67.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA executed 9/20/19, suspended 11/21/2024
- Queue status
- Suspended
- Entered queue
- 20 September 2016
- Agreement signed
- 20 September 2019
- Proposed online date
- December 2023
Location
Marker shows the centre of Box Elder County; the queue data does not give exact sites.
Other requests in Box Elder County
- Solar + storage project 754, Box Elder CountySolar + storage · 80.0 MW · agreement signed
- Nuclear project T2-013, Box Elder CountyNuclear · 500 MW · in study
- Onshore wind project BPA, Box Elder CountyOnshore wind · 95.0 MW · in study
- Battery storage project S0031, Box Elder CountyBattery storage · 80.0 MW · in study
- Solar project T2-058, Box Elder CountySolar · 10.0 MW · in study
- Solar + storage project 862, Box Elder CountySolar + storage · 45.0 MW · suspended
- Solar project 753, Box Elder CountySolar · 80.0 MW · built
- Solar project 1030, Box Elder CountySolar · 2.0 MW · built
- Onshore wind project 282, Box Elder CountyOnshore wind · 0.0 MW · built
- Battery storage project 1167, Box Elder CountyBattery storage · 650 MW · withdrawn
- Solar + storage project 978, Box Elder CountySolar + storage · 525 MW · withdrawn
- Battery storage project 1166, Box Elder CountyBattery storage · 400 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem