Solar + storage project 799, Box Elder County

Solar + storage project 799, Box Elder County is a 67.0 MW solar + storage request suspended in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.

Queue statusPaused / redesign
  1. PlanningQueued Sep 2016 (current stage)
  2. ConsentedSep 2019 (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
799
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Steel Solar, LLC
Connection point (POI)
Wheelon - Nucor transmission line
Location
Box Elder County, Utah
Technology
Solar: 67.0 MW · Battery
Total requested
67.0 MW
Service type
Energy only (ERIS)
Study phase
IA executed 9/20/19, suspended 11/21/2024
Queue status
Suspended
Entered queue
20 September 2016
Agreement signed
20 September 2019
Proposed online date
December 2023

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah · Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem