United States › Grid › Interconnection queues › Utah

ONSHORE WIND · WEST

Onshore wind project 282, Box Elder County

Onshore wind project 282, Box Elder County is a 0.0 MW onshore wind request built and operating in the West interconnection queue, in Box Elder County, Utah, connecting to PacifiCorp.

Queue statusOperating
  1. PlanningQueued Aug 2009 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Sep 2009 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
282
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
ATK Space Systems
Connection point (POI)
Lampo substation
Location
Box Elder County, Utah
Technology
Wind: 0.0 MW
Total requested
0.0 MW
Service type
Energy only (ERIS)
Study phase
No IA necessary
Queue status
Operational
Entered queue
7 August 2009
Proposed online date
September 2009

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah · Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem