Onshore wind project G0417, Box Elder County

Onshore wind project G0417, Box Elder County is a 50.0 MW onshore wind request withdrawn in the West interconnection queue, in Box Elder County, Utah.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0417
Grid region
West (non-ISO utilities)
Connection point (POI)
Into the Wendover-Minidoka 138 kV transmission line.
Location
Box Elder County, Utah
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
25 March 2010
Proposed online date
October 2013

Location

Marker shows the centre of Box Elder County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Box Elder County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem