United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

SOLAR Β· SPP

Solar project GEN-2020-006, Bowman County

Solar project GEN-2020-006, Bowman County is a 250 MW solar request withdrawn in the SPP interconnection queue, in Bowman County, North Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-006
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Bowman 230kV substation
Location
Bowman County, North Dakota
Technology
Solar: 250 MW
Total requested
250 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
23 April 2020
Proposed online date
December 2026
Withdrawn
March 2024

Location

Marker shows the centre of Bowman County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Bowman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem