United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J755, Bowman County
Onshore wind project J755, Bowman County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Bowman County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJun 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J755
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Bowman County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 14 November 2016
- Proposed online date
- March 2019
- Withdrawn
- June 2017
Location
Marker shows the centre of Bowman County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Bowman County
- Onshore wind project GEN-2017-010, Bowman CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J003, Bowman CountyOnshore wind Β· 20.0 MW Β· built
- Coal project G712, Bowman CountyCoal Β· 513 MW Β· withdrawn
- Other project G110, Bowman CountyOther Β· 500 MW Β· withdrawn
- Solar project GEN-2020-006, Bowman CountySolar Β· 250 MW Β· withdrawn
- Solar project GEN-2022-078, Bowman CountySolar Β· 180 MW Β· withdrawn
- Onshore wind project G810, Bowman CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project J018, Bowman CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G311, Bowman CountyOnshore wind Β· 19.0 MW Β· withdrawn
- Other project H035, Bowman CountyOther Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem