United States › Grid › Interconnection queues › North Dakota
ONSHORE WIND · SPPOnshore wind project GEN-2017-010, Bowman County
Onshore wind project GEN-2017-010, Bowman County is a 200 MW onshore wind request built and operating in the SPP interconnection queue, in Bowman County, North Dakota, connecting to BEPC.
Request details
- Queue ID
- GEN-2017-010
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Rhame 230 kV Sub
- Location
- Bowman County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA FULLY EXECUTED/COMMERCIAL OPERATION
- Queue status
- Operational
- Entered queue
- 14 April 2017
- Proposed online date
- December 2025
- Came online
- December 2025
Location
Marker shows the centre of Bowman County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Bowman County
- Onshore wind project J003, Bowman CountyOnshore wind · 20.0 MW · built
- Coal project G712, Bowman CountyCoal · 513 MW · withdrawn
- Other project G110, Bowman CountyOther · 500 MW · withdrawn
- Solar project GEN-2020-006, Bowman CountySolar · 250 MW · withdrawn
- Onshore wind project J755, Bowman CountyOnshore wind · 200 MW · withdrawn
- Solar project GEN-2022-078, Bowman CountySolar · 180 MW · withdrawn
- Onshore wind project G810, Bowman CountyOnshore wind · 101 MW · withdrawn
- Onshore wind project J018, Bowman CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project G311, Bowman CountyOnshore wind · 19.0 MW · withdrawn
- Other project H035, Bowman CountyOther · 15.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem