🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Ohio

ONSHORE WIND · PJM

Paulding aka Project R48

Paulding aka Project R48 is a 48.3 MW onshore wind request withdrawn in the PJM interconnection queue, in Paulding County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R48
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Antwerp - Payne 69kV
Location
Paulding County, Ohio
Technology
Wind: 48.3 MW
Total requested
48.3 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
6 December 2006
Proposed online date
November 2020
Withdrawn
January 2018

Location

Marker shows the centre of Paulding County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Paulding County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem