ONSHORE WIND Β· MISO

Onshore wind project G154, Deuel County

Onshore wind project G154, Deuel County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Deuel County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2001 (completed)
  2. Withdrawn / abandonedApr 2003 (project stopped here)
  3. ConsentedApr 2003 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G154
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Deuel County, South Dakota
Technology
Wind: 150 MW
Total requested
150 MW
Queue status
Withdrawn
Entered queue
16 November 2001
Agreement signed
3 April 2003
Proposed online date
October 2003
Withdrawn
April 2003

Location

Marker shows the centre of Deuel County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Deuel County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem