GAS Β· MISOGas project J4032, Deuel County
Gas project J4032, Deuel County is a 442 MW gas request withdrawn in the MISO interconnection queue, in Deuel County, South Dakota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4032
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Astoria - Brookings County 345.0kV
- Location
- Deuel County, South Dakota
- Technology
- Gas: 442 MW
- Total requested
- 442 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 30 May 2025
- Proposed online date
- December 2030
- Withdrawn
- December 2025
Location
Marker shows the centre of Deuel County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Deuel County
- Gas project J3941, Deuel CountyGas Β· 1,144 MW Β· in study
- Onshore wind project J1485, Deuel CountyOnshore wind Β· 250 MW Β· in study
- Other project J3400, Deuel CountyOther Β· 142 MW Β· in study
- Onshore wind project J526, Deuel CountyOnshore wind Β· 300 MW Β· built
- Gas project J510, Deuel CountyGas Β· 285 MW Β· built
- Onshore wind project J442, Deuel CountyOnshore wind Β· 200 MW Β· built
- Other project GI-0516, Deuel CountyOther Β· 1.0 MW Β· built
- Onshore wind project J597, Deuel CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G804, Deuel CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar project J3862, Deuel CountySolar Β· 250 MW Β· withdrawn
- Onshore wind project J638, Deuel CountyOnshore wind Β· 204 MW Β· withdrawn
- Onshore wind project J629, Deuel CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem