SOLAR Β· MISOSolar project J3862, Deuel County
Solar project J3862, Deuel County is a 250 MW solar request withdrawn in the MISO interconnection queue, in Deuel County, South Dakota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2024 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3862
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Astoria - Deuel County 345.0kV
- Location
- Deuel County, South Dakota
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 11 December 2024
- Proposed online date
- September 2028
- Withdrawn
- August 2025
Location
Marker shows the centre of Deuel County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Deuel County
- Gas project J3941, Deuel CountyGas Β· 1,144 MW Β· in study
- Onshore wind project J1485, Deuel CountyOnshore wind Β· 250 MW Β· in study
- Other project J3400, Deuel CountyOther Β· 142 MW Β· in study
- Onshore wind project J526, Deuel CountyOnshore wind Β· 300 MW Β· built
- Gas project J510, Deuel CountyGas Β· 285 MW Β· built
- Onshore wind project J442, Deuel CountyOnshore wind Β· 200 MW Β· built
- Other project GI-0516, Deuel CountyOther Β· 1.0 MW Β· built
- Gas project J4032, Deuel CountyGas Β· 442 MW Β· withdrawn
- Onshore wind project J597, Deuel CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G804, Deuel CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project J638, Deuel CountyOnshore wind Β· 204 MW Β· withdrawn
- Onshore wind project J629, Deuel CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem